Invest in Greece describes The Renewable Energy Sector as “a strong market with potential for growth.” The country apparently offers the right landscape and an abundance of it, the right weather and more importantly the right incentives for keen investors looking for opportunities in sustainable sources of energy.  Skeptics however say that the industry is just another bubble waiting to burst and when the government subsidies run dry so will the industry. Tekmon Geomatics is on a quest to find out the facts.

HOW DOES SOLAR ENERGY WORK?

First, it’s worth explaining how renewable energy works in Greece. Let’s take solar energy as a key example.

STEP 1: ONCE A SOLAR PARK IS LICENSED AND ESTABLISHED IT IS READY TO PRODUCE ENERGY. THE SUN HITS ITS SOLAR PANELS.

STEP 2: THE SOLAR PANELS COLLECT ENERGY FROM THE SUN AND CONVERT IT INTO AN ELECTRIC CURRENT.

STEP 3: ELECTRICITY IS PRODUCED. THE KILOWATT (KW) IS THE UNIT THAT EXPRESSES THE POWER

STEP 4: THE ELECTRICITY MARKET OPERATOR (ΛΑΓΗΕ IN GREEK) PAYS ITS RENEWABLE ENERGY PRODUCERS (I.E. THE SOLAR PARK INVESTOR) A FEED- IN-TARIFF FOR THE AMOUNT OF KWs THEIR SOLAR PARK PRODUCES PER HOUR

STEP 5 THE ELECTRICITY IS SENT TO THE NEAREST CENTRAL ELECTRICITY GRID – OWNED BY THE PUBLIC POWER CORPORATION AND MANAGED BY THE HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR

STEP 6: HERE, THE ELECTRICITY IS STORED AND DISTRIBUTED TO CONSUMERS

I’M INTERESTED IN PURCHASING LAND FOR A SOLAR PARK PROJECT. WHERE DO I LOOK?

This map is a good starting point. The darker the colors the greater the potential for solar electricity. Overall, most of the country is bathed with sunlight.  

For privately owned land plots, investors can make enquiries directly with the owner (if known) or can visit an estate agent. The land owner will then either sell or lease the land. Land prices will vary according to location but are usually negotiable.

For publicly owned land plots, investors can make enquiries to the local municipality of the area that interest them. Greece has set a target for 20% of its total energy to come from renewable sources by 2020. Hence procedures are in place to avoid unnecessary delays and the process is usually straightforward. Once communication is established (preferably with the Mayor), then the Municipality could either sell or lease the public land to the interested investor. In some cases, municipalities will even hold public tenders for potential investors to bid on leasing a favourable land plot made specific for renewable energy installations.

I OWN A LAND PLOT IN GREECE AND I WANT TO BECOME AN ENERGY PRODUCER HOW DO I GET PERMISSION?

Investors wishing to develop a solar park need to make sure that the land plot is non arable, exists outside the boundaries of a settlement or national park and is exempt from being an archeological or pre-historic site. Depending on the solar park’s installed KW capacity, the investor must possess a number of relevant documents prior to commercial operation. As a general rule, less KWs produced equals to less legislation required. This table provides a brief overview of the documents required depending on a solar park’s installed capacity.

 

How much energy will my solar park produce in KWs?

Installation

License

Required?

Environmental Permit

Required?

Y

Permit from

Local Planning Authority

Required?

Operations License Required? This license gives the Energy Producer permission to connect to The Electricity Grid. 

License Fee = 150 euros/KW installed capacity

Power Purchase Agreement Required? This agreement outlines the feed-in-tariff paid to The Energy Producer. Once signed, commercial operation is ready to begin

 

 
Less than 500 KWs No No (unless land plot is in a “Natura” defined area. Special requirements are then applicable)  Yes – Quick permit granted from the Local Planning Authority to carry out small scale building works Yes – Between The Hellenic Electricity Distribution Network and The Energy Producer.

Yes – Between The Electricity Market Operator and The Energy Producer

 
  No Yes – Contact the Municipality’s Local Environmental Authorities  Yes – same as above Yes – same as above Yes – same as above  
 

Yes – Contact the Hellenic Regulatory Authority of Energy (see website link at the end)

Yes – same as above  Yes – same as above Yes – same as above Yes – same as above  

 

There are of course experienced consultants that can offer advice and take care of the paper work. Or, when local municipalities make available public land to specifically develop solar parks, the investor can bypass the documentation process altogether.

HOW MUCH LAND DO I NEED FOR A VIABLE INVESTMENT?

It clearly depends on capacity. The land plot’s size will vary according to how much energy an investor can afford to produce. Also, the photovoltaic make, quality and its potential for energy production also play a role. On average, one can make the assumption that 40 square meters are required for a capacity of 1 KW worth of solar energy.

WHAT COSTS ARE INVOLVED?

Presently, there are many companies that specialize in solar park installations and therefore the industry is competitive - an advantage for investors. Nevertheless, it’s best to shop around. Construction companies are able to breakdown and explain all related costs. A common size for a solar park in Greece has a capacity of 100 KW installed over a 4000 square meter land plot. Excluding land related costs, licensing and connection costs, construction costs are on average 3.000 euros per KW of installed capacity. For a solar park with the potential to produce 100 KW worth of solar energy the total cost is on average 300.000 euros.

A FINAL NOTE

Nevertheless, Greece is and will remain a buyer’s market for the foreseeable future. As Greece’s recession continues, the renewable energy industry will also continue to be competitive. Land, licensing and construction costs will decrease in parallel to the tariffs therefore still making an investment in renewable energy worthwhile. In addition, it seems that renewable energy is here to stay. Fossil fuels are expensive and damaging to the environment so governments are looking at alternative sources of energy as the way forward. With new measures and reforms being implemented as part of the memorandum, an investment in renewable energy is Greece is presently considered one of the safest. Finally, Greece encourages the production of energy from many sources. While this article only focuses on solar energy, investors are strongly encouraged to equally look into other sources of energy production as a financially and environmentally sustainable investment route.


 

For their contribution to this article a special thanks to Daidalus Consultancy and Construction Company (http://www.facebook.com/DaidalosAtebe) and to Pantelis Vogiatzis, ([email protected] ) specialist in Environmental Engineering and Law.


 

Some useful links

-Law 3851/2010 “Accelerating the development of Renewable Energy Sources to deal with climate change and other regulations addressing issues under the authority of the Ministry of Environment, Energy and Climate Change

http://www.ypeka.gr/LinkClick.aspx?fileticket=qtiW90JJLYs%3d&tabid=37

-Invest in Greece – Energy Sector http://www.investingreece.gov.gr/default.asp?pid=36§orID=38&la=1

-The Hellenic Electricity Market Operator

http://www.lagie.gr/en

-The Hellenic Electricity Distribution Network Operator

http://www.deddie.gr/

-The Regulatory Authority for Energy                       http://www.rae.gr/old/en/about/main.htm

 


 